Every assembly on a property in one register, each test with its gauge readings, licence and kit dates checked at save, and a copy for the water system and one for the owner.
Each date this app counts and each check it runs on a save is listed here with its source and the day we last read it. Where a rule lives in a paid standard, we cite it and keep the same facts in our own layout; we never copy the standard's text or forms.
43
sourced rules in this trade, each read on or after Oct 28, 2026.
Dates it counts
Annual test: 12 months from the last test.From WAC 246-290-490 inspection and testing, checked Oct 28, 2026. Some records run on a different interval, which the app applies from the record.
Washington: the test kit was checked for accuracy by an independent laboratory within the twelve months before this test.From WAC 246-292-034 duties of a BAT, checked Oct 28, 2026.
Stops the save
Texas: the gauge was tested for accuracy no more than 12 months before this test, and its serial number and that date go on the report.From Form TCEQ-20700 and instructions (Revision 04-04-2019), checked Oct 28, 2026.
Stops the save
Texas: the tester held a current TCEQ backflow prevention assembly tester licence on the test date.From 30 TAC 290.44(h) (Cornell LII), checked Oct 28, 2026.
Washington: the tester's DOH certification was current on the test date, as the validation card shows.From WAC 246-292-034 duties of a BAT, checked Oct 28, 2026.
A tester's licence or certificate must be current before they test. We warn 60 days before it expires.From 30 TAC 290.44(h) (Cornell LII), checked Oct 28, 2026.
Warns on save
Washington: premises isolation for a high health hazard is an air gap, an RP or an RPDA, unless the water system granted and documented an exception.From WAC 246-290-490 premises isolation, checked Oct 28, 2026.
Warns on save
For a replacement, the report names the serial number of the assembly it replaced, when the tester knows it.From WAC 246-292-036 field test report content, checked Oct 28, 2026.
Texas: every required assembly is tested when it is installed, by a licensed tester.From 30 TAC 290.44(h)(4) (Cornell LII), checked Oct 28, 2026.
For reference
Texas: an assembly protecting against a health hazard is also tested at least once a year. The state sets no yearly test for other assemblies; the water system may.From 30 TAC 290.44(h)(4) (Cornell LII), checked Oct 28, 2026.
For reference
Washington: an assembly is tested when it is installed, repaired, reinstalled or relocated, after a backflow incident, and every year after that.From WAC 246-290-490 inspection and testing, checked Oct 28, 2026.
Florida: an assembly at a non-residential connection is tested after installation or repair and at least once a year, and is repaired if it fails.From Fla. Admin. Code R. 62-555.360 (Cornell LII), checked Oct 28, 2026.
For reference
Florida: an assembly at a residential connection (2 inches or less, serving only dwelling units) is tested after installation or repair and at least every two years.From Fla. Admin. Code R. 62-555.360 (Cornell LII), checked Oct 28, 2026.
For reference
Texas: the tester completes a report for each assembly tested and the signed, dated original goes to the water system.From 30 TAC 290.44(h)(4)(C) (Cornell LII), checked Oct 28, 2026.
For reference
Texas: a report in any format other than Form TCEQ-20700 needs TCEQ approval before a water system uses it.From 30 TAC 290.44(h)(4)(C) (Cornell LII), checked Oct 28, 2026.
Washington: the tester sends the completed report to the assembly's owner and to the water system, on paper, as a copy, by fax or electronically.From WAC 246-292-034 duties of a BAT, checked Oct 28, 2026.
For reference
Washington: each water system sets how tests are reported to it and how soon a completed report is due.From WAC 246-290-490 program elements, checked Oct 28, 2026.
For reference
Washington: the report names the facility and its owner, describes the assembly, gives each test's readings and result with any repairs, identifies the test kit and its last accuracy check, and carries the tester's certificate number, statement and signature.From WAC 246-292-036 field test report content, checked Oct 28, 2026.
Texas: a tester works on fire lines only while permanently employed by an approved fireline contractor.From 30 TAC 290.44(h)(4)(A) (Cornell LII), checked Oct 28, 2026.
Washington: the tester gives the water system the laboratory's accuracy and pressure-test document for the kit and a copy of the validation card.From WAC 246-292-034 duties of a BAT, checked Oct 28, 2026.
For reference
Washington: repairs use only the original manufacturer's replacement parts.From WAC 246-292-034 duties of a BAT, checked Oct 28, 2026.
For reference
Washington: tests follow procedures the Department of Health accepts, such as those in the latest edition of the USC Manual of Cross-Connection Control.From WAC 246-290-490 inspection and testing, checked Oct 28, 2026.
Texas: the water system keeps its backflow program records, the signed test reports among them, for at least three years.From 30 TAC 290.46(f)(3)(B) (Cornell LII), checked Oct 28, 2026.
For reference
Washington: the water system keeps each assembly's test and repair history for five years or the assembly's life, whichever is shorter.From WAC 246-290-490 recordkeeping, checked Oct 28, 2026.
Florida: the water system keeps records of each assembly's installation, testing and repair; the rule sets no period.From Fla. Admin. Code R. 62-555.360 (Cornell LII), checked Oct 28, 2026.
For reference
Asked, and answered from the rule.
How often does a backflow assembly have to be tested?
Washington: an assembly is tested when it is installed, repaired, reinstalled or relocated, after a backflow incident, and every year after that.From WAC 246-290-490 inspection and testing, checked Oct 28, 2026.
Texas: an assembly protecting against a health hazard is also tested at least once a year. The state sets no yearly test for other assemblies; the water system may.From 30 TAC 290.44(h)(4) (Cornell LII), checked Oct 28, 2026.
Florida: an assembly at a non-residential connection is tested after installation or repair and at least once a year, and is repaired if it fails.From Fla. Admin. Code R. 62-555.360 (Cornell LII), checked Oct 28, 2026.
Florida: an assembly at a residential connection (2 inches or less, serving only dwelling units) is tested after installation or repair and at least every two years.From Fla. Admin. Code R. 62-555.360 (Cornell LII), checked Oct 28, 2026.
How often must a backflow test gauge be checked for accuracy?
Washington: the test kit was checked for accuracy by an independent laboratory within the twelve months before this test.From WAC 246-292-034 duties of a BAT, checked Oct 28, 2026.
Texas: the gauge was tested for accuracy no more than 12 months before this test, and its serial number and that date go on the report.From Form TCEQ-20700 and instructions (Revision 04-04-2019), checked Oct 28, 2026.
What does a Washington backflow test report have to include?
Washington: the report names the facility and its owner, describes the assembly, gives each test's readings and result with any repairs, identifies the test kit and its last accuracy check, and carries the tester's certificate number, statement and signature.From WAC 246-292-036 field test report content, checked Oct 28, 2026.
Can a Texas tester send a backflow test report electronically?
Texas: a report in any format other than Form TCEQ-20700 needs TCEQ approval before a water system uses it.From 30 TAC 290.44(h)(4)(C) (Cornell LII), checked Oct 28, 2026.
What relief valve reading fails a reduced pressure assembly test in Washington?
Serial number, Type, Location on the property, Size, Manufacturer, and more.
Test
Test date, Reason for the test, Result, Tester, Licence or certificate number, and more.
Tester
Name, State, Credential, Licence or certificate number, Expires, and more.
Test kit
Serial number, Make and model, Last accuracy check, Laboratory, Kept for, and more.
What your client receives.
The backflow test report, water system copy, as the app issues it the moment the test is saved: signed, dated and frozen, with what is next due. This one is filled with invented records so you can read it before you sign up.