Every inspection filed before you leave the site.

Every pump's boom inspection on one board by age and hours, and an inspection record the contractor can hand to a site safety lead.

Open your free Concrete Pumps register

Free for two pumps, no card. See a sample boom inspection report

Free tool: hours between boom inspections

Age band
Hours basis
Choose one in each row and the rating appears here.

From Boom Inspection & Repair (Schwing US), manufacturer schedule (a summary of the standard), checked Wed, October 28, 2026.

The rules, with where each one came from.

Each date this app counts and each check it runs on a save is listed here with its source and the day we last read it. Where a rule lives in a paid standard, we cite it and keep the same facts in our own layout; we never copy the standard's text or forms.

5

sourced rules in this trade, each read on or after Oct 28, 2026.

Dates it counts

  1. Annual boom inspection: 1 year from the last boom inspection.From Boom Inspection & Repair (Schwing US), manufacturer schedule, checked Oct 28, 2026.
    Your contract

What it checks when you save

  1. Discharge pipe supports are built for 100 percent overload.From 29 CFR 1926.702 (eCFR), checked Oct 28, 2026.
    For reference
  2. Compressed air hoses on a pumping system use positive fail-safe joint connectors so sections cannot separate under pressure.From 29 CFR 1926.702 (Cornell LII), checked Oct 28, 2026.
    For reference
  3. The manufacturer sets a boom inspection every 1,000, 500 or 250 working hours by age, or once a year, whichever comes first.From Boom Inspection & Repair (Schwing US), manufacturer schedule (a summary of the standard), checked Oct 28, 2026.
    For reference
  4. Fills in Hours between boom inspections, from age band and hours basis.From Boom Inspection & Repair (Schwing US), manufacturer schedule, checked Oct 28, 2026.
    Computed

Asked, and answered from the rule.

How often does a concrete pump boom need inspecting?

  1. The manufacturer sets a boom inspection every 1,000, 500 or 250 working hours by age, or once a year, whichever comes first.From Boom Inspection & Repair (Schwing US), manufacturer schedule (a summary of the standard), checked Oct 28, 2026.
  2. Annual boom inspection: 1 year from the last boom inspection.From Boom Inspection & Repair (Schwing US), manufacturer schedule (a summary of the standard), checked Oct 28, 2026.

What must discharge pipe supports withstand on a concrete pumping job?

  1. Discharge pipe supports are built for 100 percent overload.From 29 CFR 1926.702 (eCFR), checked Oct 28, 2026.

What connectors do compressed air hoses on a concrete pump need?

  1. Compressed air hoses on a pumping system use positive fail-safe joint connectors so sections cannot separate under pressure.From 29 CFR 1926.702 (Cornell LII), checked Oct 28, 2026.

When the next one is due.

The same count the app keeps on every record, here without an account.

Free tool: next due date

Enter the date and the next one appears here.

From Boom Inspection & Repair (Schwing US), manufacturer schedule (a summary of the standard), checked Wed, October 28, 2026.

What it keeps for you.

Pump

Unit ID, Pump or boom serial, Manufacturer, Age band, Working hours, and more.

Operator

Name, Card or certificate number, Card expiry.

Boom inspection record

Date, Working hours at inspection, Qualified person, Findings, Repairs.

What your client receives.

The boom inspection report, as the app issues it the moment the inspection is saved: signed, dated and frozen, with what is next due. This one is filled with invented records so you can read it before you sign up.

Building owners read every report filed to them in one binder, free.

Sample Inspection Co. (fictional) · Concrete Pumps

Boom inspection report

UN-4100

Pump

Unit ID
UN-4100
Pump or boom serial
SE-4100
Manufacturer
Brackwater Equipment
Age band
First 5 years

and 4 more fields

Inspection

Scheduled
Jun 23, 2026
Completed
Jun 23, 2026
Status
Completed

Boom inspection

Boom sections, pins, bearings and welds checked for cracks and wearPass
Pedestal, outriggers, turret and main column checkedPass
Delivery pipe, clamps, supports and hoses in good conditionPass
Hours in service and last periodic inspection date recordedPass
Inspector is a qualified personPass

Boom inspection record

DateWorking hours at inspectionQualified personFindingsRepairs
Sep 11, 20261 hourQualified person 1
Jan 24, 202614 hoursQualified person 11

Tables

Lookup results appear on each record above.

Photos

No photos on file.

Findings

No findings on file.

Signature

Not signed in the app; signed on paper if at all.

Next due

Annual boom inspectionSep 11, 2027Set by your contract

A recordkeeping aid. It does not certify compliance and is not legal advice.

Every name, date and number on this sample is invented.

What Concrete Pumps costs.

Free

$0
  • 2 pumps
  • 1 person

Solo

$9 a monthFounders price; list $19
  • 15 pumps
  • 2 people

Crew

$24 a monthFounders price; list $49
  • 100 pumps
  • 10 people

Company

$49 a monthFounders price; list $99
  • 600 pumps
  • 25 people

All-Access

$74 a monthFounders price; list $149
  • 600 pumps
  • 25 people
  • The same limits in every trade
Join in the first 30 days and you pay half, for life. Export everything on every plan.

Your trade

Tell us what your inspector asks for, and we will build it into Concrete Pumps.

Open your free registerWrite to us