tradesbinder.
Find My App

Lead-Safe Renovation

Every job filed before you leave the site.

Every covered job produces the record the RRP Rule requires, the owner and occupant copy on time, and a three-year archive you can hand an inspector in a minute.

Open your free Lead-Safe Renovation register

Free for two jobs a month, no card. See a sample lead-safe renovation job record

Free tool: next due date

Enter the date and the next one appears here.

From 40 CFR 745.86(c), checked Wed, October 28, 2026.

Does the rule reach this job?

Answer as you go. The tool stops at the first answer that settles it and shows the rule behind the verdict, word for word, with its source.

Free tool: Does the RRP Rule cover this home renovation?

Was the home built before 1978?
The answer appears here as soon as your answers settle it.

The rules, with where each one came from.

Each date this app counts and each check it runs on a save is listed here with its source and the day we last read it. Where a rule lives in a paid standard, we cite it and keep the same facts in our own layout; we never copy the standard's text or forms.

16

sourced rules in this trade, each read on or after Oct 28, 2026.

Dates it counts

  1. Owner and occupant summary due: 30 days from the completed on, or by the final invoice delivered on if that comes first.From 40 CFR 745.86(c), checked Oct 28, 2026.
    Rule
  2. Earliest record disposal date: 3 years from the completed on.From 40 CFR 745.86(a), checked Oct 28, 2026.
    Rule

What it checks when you save

  1. Pre-renovation notices go out no more than 60 days before work begins.From EPA: Frequent Questions About Pre-Renovation Education Under the RRP Rule, checked Oct 28, 2026.
    Stops the save
  2. A mailed pamphlet needs a certificate of mailing dated at least 7 days before the renovation starts.From EPA: Frequent Questions About Pre-Renovation Education Under the RRP Rule, checked Oct 28, 2026.
    Stops the save
  3. Self-certification of pamphlet delivery is allowed only for tenant-occupied units, never for owners.From EPA: Frequent Questions About Pre-Renovation Education Under the RRP Rule, checked Oct 28, 2026.
    Stops the save
  4. Emailing the pamphlet requires E-SIGN Act consent: the recipient consents electronically in a way that shows they can open it, is told how to withdraw consent, and gets the hardware and software requirements.From EPA: Frequent Questions About Pre-Renovation Education Under the RRP Rule, checked Oct 28, 2026.
    Stops the save
  5. Minor repair and maintenance disturbs 6 sq ft or less of painted surface per room inside, or 20 sq ft or less outside, uses no prohibited or restricted practice, and involves no window replacement or demolition of painted surfaces. Non-emergency jobs in the same room within 30 days count as one job.From 40 CFR 745.83 (definitions), checked Oct 28, 2026.
    For reference
  6. Zero-bedroom dwellings are exempt unless a child under six resides or is expected to reside there.From EPA: Frequent Questions About Pre-Renovation Education Under the RRP Rule, checked Oct 28, 2026.
    For reference
  7. Emergency renovations skip pre-renovation education, and skip warning signs, containment, waste handling, training and certification only as far as the emergency requires. Cleaning, cleaning verification by a certified renovator, and the related records still apply.From 40 CFR 745.82(b), checked Oct 28, 2026.
    For reference
  8. The rule applies to renovations done for pay in target housing and child-occupied facilities.From 40 CFR 745.82(a), checked Oct 28, 2026.
    For reference
  9. Target housing is housing built before 1978. Housing for the elderly or people with disabilities, and 0-bedroom dwellings where the living area is not separated from the sleeping area, are not target housing unless a child under six lives or is expected to live there.From 40 CFR 745.103 (definitions), checked Oct 28, 2026.
    For reference
  10. A job is exempt where an inspector or risk assessor found the components free of lead-based paint, or a certified renovator's EPA-recognized test kit or a laboratory's paint-chip result came back negative, and the firm keeps a copy.From 40 CFR 745.82(a), checked Oct 28, 2026.
    For reference
  11. EPA runs the RRP program everywhere except in fourteen states and one tribe it has authorized to run their own: Alabama, Delaware, Georgia, Iowa, Kansas, Massachusetts, Mississippi, North Carolina, Oklahoma, Oregon, Rhode Island, Utah, Vermont, Wisconsin and the Minnesota Chippewa Tribe-Boise Forte (Nette Lake). There, the state or tribal program certifies firms and sets the rules a job follows.From EPA, Renovation, Repair and Painting Program (page updated 2026-06-17), checked Oct 29, 2026.
    For reference
  12. The firm keeps all records needed to show compliance for 3 years after the renovation is completed; longer state or tribal requirements still apply.From 40 CFR 745.86(a), checked Oct 28, 2026.
    Stops the save
  13. Compliance information goes to the owner and an adult occupant (or a representative of a child-occupied facility) when the final invoice is delivered or within 30 days of completion, whichever is earlier.From 40 CFR 745.86(c), checked Oct 28, 2026.
    For reference
  14. Every covered job needs an assigned certified renovator with a current certificate.From EPA: RRP Program Work Practices, checked Oct 28, 2026.
    Warns on save

Asked, and answered from the rule.

Can I email the Renovate Right pamphlet to a customer?

  1. Emailing the pamphlet requires E-SIGN Act consent: the recipient consents electronically in a way that shows they can open it, is told how to withdraw consent, and gets the hardware and software requirements.From EPA: Frequent Questions About Pre-Renovation Education Under the RRP Rule, checked Oct 28, 2026.

How long must RRP records be kept?

  1. The firm keeps all records needed to show compliance for 3 years after the renovation is completed; longer state or tribal requirements still apply.From 40 CFR 745.86(a), checked Oct 28, 2026.

When does a repair count as minor maintenance under the RRP Rule?

  1. Minor repair and maintenance disturbs 6 sq ft or less of painted surface per room inside, or 20 sq ft or less outside, uses no prohibited or restricted practice, and involves no window replacement or demolition of painted surfaces. Non-emergency jobs in the same room within 30 days count as one job.From 40 CFR 745.83 (definitions), checked Oct 28, 2026.

When must the owner get the post-renovation summary?

  1. Compliance information goes to the owner and an adult occupant (or a representative of a child-occupied facility) when the final invoice is delivered or within 30 days of completion, whichever is earlier.From 40 CFR 745.86(c), checked Oct 28, 2026.

Does my state run its own RRP program?

  1. EPA runs the RRP program everywhere except in fourteen states and one tribe it has authorized to run their own: Alabama, Delaware, Georgia, Iowa, Kansas, Massachusetts, Mississippi, North Carolina, Oklahoma, Oregon, Rhode Island, Utah, Vermont, Wisconsin and the Minnesota Chippewa Tribe-Boise Forte (Nette Lake). There, the state or tribal program certifies firms and sets the rules a job follows.From EPA, Renovation, Repair and Painting Program (page updated 2026-06-17), checked Oct 29, 2026.

What it keeps for you.

Property

Address, Year built, Type, Zero-bedroom dwelling, Child under six lives or will live here, and more.

Firm

Firm name, Certifying program, Firm certification number, Firm certification expiry.

Certified renovator

Name, Certificate number, Most recent course date, Training provider, Certificate expiry, and more.

On-the-job training record

Worker, Date, Certified renovator who trained, Practices taught.

Job

Scope of work, Exterior painted surface disturbed, Includes window replacement, Includes demolition of painted surfaces, Emergency renovation, and more.

Interior work by room

Room, Painted surface disturbed in this room, Date.

Lead determination

Method, Test kit brand and model, Component tested, Location, Result, and more.

Pre-renovation notice

Recipient, Method, Delivered or mailed on, Acknowledgment signature, E-SIGN consent record, and more.

Cleaning verification

Room or area, Re-cleans, Dust clearance report (if used instead), Photo.

What your client receives.

The lead-safe renovation job record, as the app issues it the moment the job is saved: signed, dated and frozen, with what is next due. This one is filled with invented records so you can read it before you sign up.

Building owners read every report filed to them in one binder, free.

Sample Inspection Co. (fictional) · Lead-Safe Renovation

Lead-safe renovation job record

120 Foundry Rd, Springfield

Firm

Firm nameCertifying programFirm certification numberFirm certification expiry
Avery LundEPACE-4100Apr 19, 2027

Certified renovator

NameCertificate numberMost recent course dateTraining providerCertificate expiry
Avery LundCE-4100Sep 11, 2026Training provider 1Mar 30, 2027
Jordan PikeCE-4137Jul 20, 2026Training provider 2Mar 30, 2027

On-the-job training record

WorkerDateCertified renovator who trainedPractices taught
Avery LundSep 11, 2026Avery LundRecorded on site.
Jordan PikeJul 20, 2026Jordan PikeRecorded on site.
Sam OkaforMay 28, 2026Avery LundRecorded on site.

Property

Address
120 Foundry Rd, Springfield
Year built
1701
Type
Single-family
Zero-bedroom dwelling
Yes

and 2 more fields

Job

Scope of work
Recorded on site.
Exterior painted surface disturbed
1 sq ft
Includes window replacement
Yes
Includes demolition of painted surfaces
Yes

and 5 more fields

Interior work by room

RoomPainted surface disturbed in this roomDate
North bay1 sq ftSep 11, 2026
Bay 23 sq ftApr 5, 2026

Lead determination

MethodTest kit brand and modelComponent testedLocationResultLab name and address
Presumed presentKI-4100Component tested 1North bayPositive120 Foundry Rd, Springfield
Inspector or risk assessor reportKI-4211Component tested 4Bay 2Negative171 Market St, Springfield

Pre-renovation notice

RecipientMethodDelivered or mailed on
OwnerSigned hand deliveryAug 2, 2026
Parents or guardians (child-occupied facility)Tenant self-certificationAug 2, 2026

Consents

Client consents are recorded through the client link.

Work practices

Warning signs posted at the work areaPass
Work area contained so dust and debris stay insidePass
No prohibited practices (open-flame burning, high-speed paint removal without HEPA exhaust control, very hot heat guns)Pass
Waste contained and removed at the end of each dayPass

Cleaning verification

Room or areaRe-cleans
North bay1
Bay 23

Close out

Visual check: no dust, debris or residue in the work areaPass
Cleaning verification done by the certified renovatorPass

Readings

Cleaning verification card comparisonPassPass

Photos

No photos on file.

Signature

Not signed in the app; signed on paper if at all.

A recordkeeping aid. It does not certify compliance and is not legal advice.

Every name, date and number on this sample is invented.

What Lead-Safe Renovation costs.

Free

$0
  • 2 jobs a month
  • 1 person

Solo

$9 a monthFounders price; list $19
  • 20 jobs a month
  • 2 people

Crew

$24 a monthFounders price; list $49
  • 1,000 jobs a month
  • 10 people

Company

$49 a monthFounders price; list $99
  • 5,000 jobs a month
  • 25 people

All-Access

$74 a monthFounders price; list $149
  • 5,000 jobs a month
  • 25 people
  • The same limits in every trade
Join in the first 30 days and you pay half, for life. Export everything on every plan.

Your trade

Tell us what your inspector asks for, and we will build it into Lead-Safe Renovation.

Open your free registerWrite to us