Every leveler, door, restraint and seal listed by door number, each one's planned maintenance on the customer's schedule, and repairs followed from the visit to the signed quote.
Your customer sets this interval; no rule fixes one.
The rules, with where each one came from.
Each date this app counts and each check it runs on a save is listed here with its source and the day we last read it. Where a rule lives in a paid standard, we cite it and keep the same facts in our own layout; we never copy the standard's text or forms.
6
sourced rules in this trade, each read on or after Oct 29, 2026.
Dates it counts
Planned maintenance: the interval set in pm interval (months) from the last pm visit.Set per customer; no rule fixes this interval.
Every dockboard, dock levelers included, must be able to hold the heaviest load it is meant to carry.From 29 CFR 1910.26 Dockboards (Cornell LII), checked Oct 29, 2026.
For reference
A dockboard first put into service on or after January 17, 2017 is built and kept so a forklift or other transfer vehicle cannot run off its edge, unless the employer shows there is no run-off hazard.From 29 CFR 1910.26 Dockboards (Cornell LII), checked Oct 29, 2026.
For reference
While anyone is on a dockboard, wheel chocks, sand shoes or a similar measure keep the truck, trailer or rail car under it from moving.From 29 CFR 1910.26 Dockboards (Cornell LII), checked Oct 29, 2026.
A dockboard first put into service on or after January 17, 2017 is built and kept so a forklift or other transfer vehicle cannot run off its edge, unless the employer shows there is no run-off hazard.From 29 CFR 1910.26 Dockboards (Cornell LII), checked Oct 29, 2026.
What keeps a trailer from moving while it is loaded at the dock?
While anyone is on a dockboard, wheel chocks, sand shoes or a similar measure keep the truck, trailer or rail car under it from moving.From 29 CFR 1910.26 Dockboards (Cornell LII), checked Oct 29, 2026.
Every dockboard, dock levelers included, must be able to hold the heaviest load it is meant to carry.From 29 CFR 1910.26 Dockboards (Cornell LII), checked Oct 29, 2026.
Door number, Equipment, Drive, Manufacturer, Model, and more.
What your client receives.
The dock pm report, as the app issues it the moment the pm visit is saved: signed, dated and frozen, with what is next due. This one is filled with invented records so you can read it before you sign up.