Each date this app counts and each check it runs on a save is listed here with its source and the day we last read it. Where a rule lives in a paid standard, we cite it and keep the same facts in our own layout; we never copy the standard's text or forms.
10
sourced rules in this trade, each read on or after Oct 28, 2026.
Dates it counts
Routine owner check: the interval set in routine check interval (days) from the last routine check.Our suggested interval; no rule sets one.
Follow the manufacturer's maintenance instructions and inspection schedule closely; where none exists, set your own.From Public Playground Safety Handbook (CPSC), checked Oct 28, 2026.
Install loose fill deeper than the minimum to allow for settling, for example 12 inches at first where 9 are needed.From Public Playground Safety Handbook (CPSC), checked Oct 28, 2026.
For reference
Keep the records of every maintenance inspection and repair. The handbook states no retention period.From Public Playground Safety Handbook (CPSC), checked Oct 28, 2026.
Install loose fill deeper than the minimum to allow for settling, for example 12 inches at first where 9 are needed.From Public Playground Safety Handbook (CPSC), checked Oct 28, 2026.
How often must a Michigan child-care center inspect its play area?
Keep the records of every maintenance inspection and repair. The handbook states no retention period.From Public Playground Safety Handbook (CPSC), checked Oct 28, 2026.
Playground name, Used by, Surfacing, Routine check interval, Last routine check, and more.
What your client receives.
The playground check record, as the app issues it the moment the check is saved: signed, dated and frozen, with what is next due. This one is filled with invented records so you can read it before you sign up.