Each date this app counts and each check it runs on a save is listed here with its source and the day we last read it. Where a rule lives in a paid standard, we cite it and keep the same facts in our own layout; we never copy the standard's text or forms.
9
sourced rules in this trade, each read on or after Oct 29, 2026.
In Washington, a surveyor who establishes, reestablishes or restores a corner on a boundary between ownerships, or a government land office corner, files a record of survey with the county auditor within 90 days.From RCW 58.09.040 records of survey, contents, filing (Washington Legislature), checked Oct 29, 2026.
For reference
In Washington, the record of survey shows every monument found, set, reset, replaced or removed, with its kind, size and location, plus the basis of bearings and ties to adjoining surveys of record.From RCW 58.09.060 records of survey, contents (Washington Legislature), checked Oct 29, 2026.
In Washington, a corner record describes and locates, from the corner position, every monument and accessory found and every one placed or replaced, with the basis of bearings.From RCW 58.09.060 records of survey, contents (Washington Legislature), checked Oct 29, 2026.
How long does a Washington surveyor have to file a record of survey?
In Washington, a surveyor who establishes, reestablishes or restores a corner on a boundary between ownerships, or a government land office corner, files a record of survey with the county auditor within 90 days.From RCW 58.09.040 records of survey, contents, filing (Washington Legislature), checked Oct 29, 2026.
When is a California record of survey due, and what if it will be late?
What must a Washington record of survey show about each monument?
In Washington, the record of survey shows every monument found, set, reset, replaced or removed, with its kind, size and location, plus the basis of bearings and ties to adjoining surveys of record.From RCW 58.09.060 records of survey, contents (Washington Legislature), checked Oct 29, 2026.
Can a survey monument be removed in Washington without a permit?
Job number, Survey type, County, Assessor's parcel number, Legal description of record, and more.
Field day
Date, Crew, Work done, Instruments, Crew hours, and more.
Monument
Point number, Found or set, Kind, Size, Cap or tag stamping, and more.
Corner record
Corner, Replaced or restored on, Filing deadline, Monuments and accessories found, Monuments and accessories placed or replaced, and more.
What your client receives.
The job status, as the app issues it the moment the field day is saved: signed, dated and frozen, with what is next due. This one is filled with invented records so you can read it before you sign up.