Each date this app counts and each check it runs on a save is listed here with its source and the day we last read it. Where a rule lives in a paid standard, we cite it and keep the same facts in our own layout; we never copy the standard's text or forms.
16
sourced rules in this trade, each read on or after Oct 29, 2026.
Dates it counts
Reserve repack: 180 days from the last visit.From 14 CFR 105.43(b) reserve parachute packing (eCFR), checked Oct 29, 2026. Some records run on a different interval, which the app applies from the record.
A reserve whose canopy, shroud lines and harness are synthetic only is used within 180 days of being packed by a certificated parachute rigger.From 14 CFR 105.43(b)(1) reserve packed within 180 days (eCFR), checked Oct 29, 2026.
A main is packed by a certificated parachute rigger, by the person making the next jump with it, or by someone without a certificate working under a certificated rigger's direct supervision.From 14 CFR 105.43(a) main parachute packing (eCFR), checked Oct 29, 2026.
The rigger who packs a parachute writes the date and place of packing and any defects found on inspection on the packing record attached to it.From 14 CFR 65.131(c) parachute packing record (eCFR), checked Oct 29, 2026.
For reference
A rigger keeps the record of each pack, repair and alteration for at least 2 years after the date it is made.From 14 CFR 65.131(b) rigger records (eCFR), checked Oct 29, 2026.
Stops the save
An installed AAD is maintained as its maker's instructions say. The service date here is the one entered from those instructions.From 14 CFR 105.43(c) automatic activation device (eCFR), checked Oct 29, 2026.
Warns on save
An installed AAD is maintained as its maker's instructions say. The end-of-life date here is the one entered from those instructions.From 14 CFR 105.43(c) automatic activation device (eCFR), checked Oct 29, 2026.
A rigger works under the certificate only after at least 90 days of rigging within the preceding 12 months, or after showing the FAA they can do the work, and with the maker's current instructions understood.From 14 CFR 65.129(f) performance standards (eCFR), checked Oct 29, 2026.
Each rigger has a seal with an identifying mark and seals the pack after packing, as the parachute's maker recommends.From 14 CFR 65.133 seal (eCFR), checked Oct 29, 2026.
For reference
Asked, and answered from the rule.
How often does a reserve parachute have to be repacked?
A reserve whose canopy, shroud lines and harness are synthetic only is used within 180 days of being packed by a certificated parachute rigger.From 14 CFR 105.43(b)(1) reserve packed within 180 days (eCFR), checked Oct 29, 2026.
A main is packed by a certificated parachute rigger, by the person making the next jump with it, or by someone without a certificate working under a certificated rigger's direct supervision.From 14 CFR 105.43(a) main parachute packing (eCFR), checked Oct 29, 2026.
The rigger who packs a parachute writes the date and place of packing and any defects found on inspection on the packing record attached to it.From 14 CFR 65.131(c) parachute packing record (eCFR), checked Oct 29, 2026.
A rigger keeps the record of each pack, repair and alteration for at least 2 years after the date it is made.From 14 CFR 65.131(b) rigger records (eCFR), checked Oct 29, 2026.
What it keeps for you.
Rig
Rig number, Use, Owner, Harness and container make and model, Container serial number, and more.
Rigger's log entry
Date, Work done, What was done, Place, Defects found on inspection, and more.
Rigger
Name, Certificate number, Certificate, Type ratings, Seal symbol.
Rental
Jumper, Out on, Reserve date on the pack card, AAD switched on, Handed out by, and more.
What your client receives.
The reserve repack record, as the app issues it the moment the visit is saved: signed, dated and frozen, with what is next due. This one is filled with invented records so you can read it before you sign up.